We are nearing the final release of 9.2. CR1 can be downloaded or is available from Maven.
A feature was added since Beta2:
Please try out all of issues on the CR to provide feedback before the final release. If nothing significant is found we'll be ready for a final in about a week to 10 days.
Thank you,
Steve
A feature was added since Beta2:
- TEIID-4398 VDB Migration tool - Migration tool to convert .vdb & -vdb.xml files into DDL based VDB
Please try out all of issues on the CR to provide feedback before the final release. If nothing significant is found we'll be ready for a final in about a week to 10 days.
Thank you,
Steve
Comments
Post a Comment